Design Manual › Pre-treatment › Equalization basin
FREE ENGINEERING TOOL · PRE-TREATMENT
Equalization Basin
Set the flow, peaking factor and peak duration — get the basin volume that smooths the diurnal
surge, the hydraulic retention time, the surface area and the mixing power. The unit that turns a spiky
SEA influent into a steady feed for the biology and the dosing skids.
1Duty & basin
Size the basin to absorb the peak surge while discharging at the average: V = (Peak−1)·Q·τ/24. Then mix to stop septicity and keep solids in suspension.
Results — basin & mixing
EQ volume V
—m³
Retention
—h
Mixing power
—kW
| Item | Value | Basis |
|---|
2Mass balancing
What the basin actually does to the flow and load profile hitting the plant.
| Item | Value | Basis |
|---|
Operation envelope
| Item | Value | Basis |
|---|
Quote the EQ instruments at factory price
An equalization basin needs in/out flowmeters, a level transmitter, pH and the mixer/VFD signal — all mappable to our catalogue and supplied at the manufacturer's ex-works price (margin from the export rebate only).
Request a quote for this duty ← Headworks Primary Clarifier →Response within 24 hours · Inputs stay in your browser — nothing is uploaded.
Sources & parameter basis
| [1] | WEF / METCALF & EDDY — equalization volume V = (Peak−1)·Q·τ/24; peak factor 1.5–3×, peak duration 2–10 h, depth 3–6 m. |
| [2] | Mixing 4–10 W/m³ (mechanical) or 0.006–0.012 m³ air/m³·min (diffused); power = V·w_mix (mechanical) — prevents settling & septicity. |
Full derivation and worked example: Equalization-Basin-Calculation-Sheet.md. The EQ basin is the buffer that makes every downstream unit predictable — run it, then carry Q into the primary clarifier.
Questions about a duty, a specification, or transparent sourcing? Contact our application engineers →