FREE ENGINEERING TOOL · PROCESS CHAIN

MBR (Membrane Bioreactor) Design

An MBR replaces the secondary clarifier with membranes. Set the flow, the high MLSS, HRT and design flux — get the bioreactor volume, permeate flow, required membrane area and module count, and the transmembrane pressure / permeability that decide cleaning frequency.

1Duty & membrane

MBR runs high MLSS (8–12 g/L) at short HRT; flux 15–30 LMH; recovery 90–98 %.

Results — reactor & membrane

Bioreactor V
Membrane area
Modules
ea
ItemValueBasis

2Permeability & cleaning

Permeability K = J / TMP drops as fouling builds — that is what CEB and the cleaning interval manage.
ParameterValueNote

Order note

Quote the MBR instruments at factory price

An MBR is the most instrument-dense unit on the plant: TMP per rack, permeability trend, DO, MLSS, permeate turbidity and level. We supply them at the manufacturer's ex-works price — margin from the export rebate only.

Request a quote for this duty ← Primary Clarifier Sludge Thickening & Dewatering →
Response within 24 hours · Inputs stay in your browser — nothing is uploaded.

Sources & parameter basis

[1]Metcalf & Eddy / Judd MBR — MLSS 8–12 g/L, HRT 3–8 h, recovery 90–98 %, SRT 20–60 d.
[2]Module area: hollow-fibre ~30 m²/mod, flat-sheet ~15–25 m²/mod (vendor catalogues).
[3]Design flux 15–30 LMH; TMP 0.2–0.6 bar; permeability K = J/TMP (LMH/bar); tropical viscosity lifts flux ~2 %/°C.
Full derivation and worked example: MBR-Calculation-Sheet.md. An MBR is the clarifier-replacing biological variant — size it, then carry the sludge into the thickening tool.
© 2026 Nanjing JiuYuHui Environmental Technology Co., Ltd. · jiuyuhub.com · Municipal WWTP design manual — Biological (variant, membrane).
⚠ Screening values only. Outputs from this tool are engineering screening estimates. Final equipment sizing, and any construction or permit submission, must be confirmed against the manufacturer’s verified performance curves and the applicable local regulation (e.g., Vietnam QCVN 14 / Indonesia PERMENLHK 68).
Questions about a duty, a specification, or transparent sourcing? Contact our application engineers →