Design ManualBiological treatment › Secondary clarifier
FREE ENGINEERING TOOL

Secondary Clarifier Calculator

Four-way SOR / SLR envelope · tank count & diameter · RAS concentration check vs SVI · activated sludge & BNR, tropical conditions

iWhat this tool does

A clarifier must clarify and thicken. At BNR solids (MLSS 3.5–5 g/L) the solids duty almost always governs — so this tool sizes the tank as the envelope of four criteria, then runs every check on the installed area.
  • New build — enter flow / MLSS / RAS / SVI; get the required area, tank count and diameter.
  • Existing tank — switch mode, enter your diameter & count; the tool checks it against all four criteria and finds the maximum sustainable flow & MLSS.
Take the MLSS and RAS from the A²/O tool. This page is the downstream check of the bio-reactor — run the A²/O (or aeration) tool first, then confirm the tank can actually hold that solids load.

1Load from the bio-reactor

Default envelope: avg SOR 24 / pk 48 · avg SLR 120 / pk SLR 240 kg/m²·d — Indonesian upper envelope + BNR peak.
Design criteria (defaults adjustable)
Sources: [1] North-American rules; [3] SUPRA Indonesia; [5] BNR literature; [6] industrial guide. Peak-SLR uses PF·Q with the average RAS — never scale the RAS with the peak. Editing any value below switches the basis to Custom.

Results — required area & tank

Required area
Diameter × tanks
m
Installed area
ItemValueUnit

Results — checks on the installed tank

CheckValueLimitMarginStatus

RAS concentration & SVI check

ItemValueUnit

Clarifier instrumentationMAPPED TO OUR RANGE

Sludge-blanket detectors and sludge scrapers are outside our standard line (normally EPC-supplied) — the instruments below are the process instruments we carry and quote at factory-direct price.
DutyInstrumentModel / specQty

Quote this clarifier's instruments at factory price

RAS flow meters, MLSS monitors, turbidity and ORP instruments at the manufacturer's ex-works price — our margin comes solely from the export tax rebate. Run the A²/O tool first if you haven't sized the bio-reactor yet.

Request a quote for this duty ← A²/O Biological Nutrient Removal
Response within 24 hours · Your inputs stay in your browser — nothing is uploaded.

Sources & parameter basis

[1]Ten States Standards / Wyoming Sewage Rules §11-17 — SOR 600/1 200 gpd/ft², SLR 28/50 lb/d/ft², stricter separate-nitrification columns, 2 h detention @ peak, weir loads.
[3]SUPRA International, Indonesian municipal applications — SOR 20–28/50–65 m³/m²·d, SLR 3.5–5.5 kg/m²·h, SWD 4.0–4.5 m, weir 150–220 m³/m·d, D 28–40 m, SVI 100–140.
[5]Water (MDPI, 2022) clarifier review — BNR SOR 24–32/42–64, SLR 120–192/240, SVI >200 indicates filamentous bulking.
[6]Spans / CPCB industrial ETP clarifier guide — SOR/SLR tables, RAS 25–100 %, X_r 6 000–12 000 mg/L, blanket <1 m / ≤60 % SWD, 10⁶/SVI limit.
Method. Required area = envelope of avg/peak SOR and avg/peak SLR; peak solids use PF·Q with the average RAS. RAS concentration cross-check: X_r = (1+R)/R · X (mass balance) vs 10⁶/SVI (settling limit). SWD-based volume gives the peak detention check.

Limits. SVI is plant-specific and time-varying — the 10⁶/SVI value is a screening bound, not a substitute for settling-column / flux testing. Guard against rising sludge (blanket denitrification) and secondary P release in BNR clarifiers. Preliminary design only — not for construction issue or regulatory submission.
⚠ Screening values only. Outputs from this tool are engineering screening estimates. Final equipment sizing, and any construction or permit submission, must be confirmed against the manufacturer’s verified performance curves and the applicable local regulation (e.g., Vietnam QCVN 14 / Indonesia PERMENLHK 68).